Ohio Lumex Zeeman Mercury Analyzer








PRODUCTS Search
PRODUCTS | PARTS

  Appendix K Long Term Testing Spiked Sorbent Traps


Appendix K Long Term Testing Vapor-Spiked Sorbent Traps at a variety of spike levels are available for Long Term and Continuous testing. These 10mm extra durable 3 section sorbent traps are typically used from a 1-7+ day sampling and can be used when pulling up to 1 liter per minute flow. They are all custom spiked for extra spike retention at any level the customer requires.

 

Ohio Lumex Appendix K Long-term Testing Spiked Sorbent Trap

 

Technology

 

On March 15, 2005, EPA issued the Clean Air Mercury Rule (CAMR) to reduce and cap mercury emissions from coal-fired Power Plants.

The CFR 40, part 75 - Continuous Emissions Monitoring outlined as Appendix K entitled "Quality Assurance and Operating Procedures For Sorbent Trap Monitoring Systems" enable Power Plants to use a low cost alternative to CEMMs, which have much higher capital cost, installation/certification and maintenance cost.

Use of Sorbent Traps with the Direct analysis by Thermal Method is allowed as a compliance reporting procedure by these regulations.

Mercury Emissions Testing Traps and portable Direct Sorbent Trap analyzer available from Ohio Lumex satisfy the strict QA/QC procedures outlined in the method.


Appendix K Sorbent Traps technical specifications
  • Spiked/Not Spiked 3 sections Sorbent Traps availabe in all sizes - 6 mm and 10 mm OD; 4 sections traps available for gas mercury specialization;
  • Iodinated, acid washed coconut shell charcoal. 150 mg and 1 g loading on small/large trap section;
  • Low mercury background levels - less then 1 ng per section;
  • Easy to remove and easy to set for “leak check” cap plugs, color coded (blue caps for spiked);
  • Unique sample high temperature ID ink with chain of custody sheet in protective pack;
  • Size “Calibrated” extra thick glass for trap rigidity;
  • Customized Spiking level for 3rd section - 50 to 200,000 ng loadings available;
  • 10% of every spiked traps batch analyzed and recorded for QA/QC purpose;
  • Rigorous QA/QC procedures at every manufacturing step;
  • Long term storage stability - one year;
  • Long sampling duration - up to 2 weeks;
  • High capacity mercury loading tested - up to 1,000,000 ng per section;
  • Available immediately from stock with or without analysis;
  • Significant discounts on large quantities - contract based orders;
  • In-house analysis with short turnaround time.

 

 






HOME | ABOUT COMPANY | PRODUCTS | APPLICATIONS | ANALYSIS TECHNIQUE | NEWS | CONTACT
 
Copyright © 2001 - 2006 OhioLumex Co. Design NDA Solaris